|
|
|
|
ETC Tiger Pipeline Expansion Project, Phase I
Project Description
ETC Tiger has recently signed a precedent agreement with a Haynesville producer for transportation services which will require an expansion of its ETC Tiger Pipeline. ETC Tiger anticipates filing a certificate application with the FERC in June 2010 for authorization to construct, own, and operate approximately 20 miles of 42-inch natural gas pipeline looping and the installation of five additional gas fired compressor units at three compressor stations to provide up to 400,000 Mcf per day of firm capacity.
Key Facts
Capacity: |
400,000 Mcf/day of firm capacity |
In-Service: |
3rd-4th Quarter 2011 |
Description: |
Approximately 20 miles of 42-inch natural gas pipeline looping and the installation of five (5) compressor units |
Location: |
The pipeline looping will be between Mile Posts 69.9 to 77.9, and Mile Posts 118.0 to 130.3. The compressor units will be install at the Cannisnia Station (1 unit), Bienville Station (1 unit), and Chatham Station (3 units). All construction activities will be within the Bienville, Jackson, and Ouachita Parishes, Louisiana. |
Supply Source: |
Haynesville Shale, Bossier Sands, and Fort Worth Basin production areas |
End Markets: |
Deliveries available to seven (7) interstate pipelines and one (1) intrastate pipeline for ultimate delivery to the Midwest and Northeast |
ROW: |
The majority of the pipeline looping will be within the existing construction right-of-way of the initial ETC Tiger Pipeline Project; minor deviation may be required due to physical limitations.
|
Project Schedule
February 16 - March 18, 2010 |
Open Season for Potential Shippers |
| May 4 and 5, 2010 |
Open House meetings in Mansfield and Jonesboro, LA |
| June - July 2010 |
File FERC Certificate Application |
| April 2011 |
Receive FERC Certificate Order |
| May 2011 |
Begin Construction |
| 3rd-4th Quarter 2011 |
In-Service |
Project Location Map
|
 |
| |
|
PROJECT HOTLINE
888-844-3718
(888-TIGER18)

Click above to learn more about Energy Transfer Partners, L.P.
COMMITMENT TO ENVIRONMENTAL PROTECTION
Energy Transfer is committed to the protection of cultural resources, endangered species, and other sensitive areas. The ETC Tiger Pipeline Expansion Project, Phase I will be designed and constructed in compliance with all Federal, state, and local laws and permits.
COMMITMENT TO SAFETY
The ETC Tiger Pipeline Expansion Project, Phase I system will be designed, constructed, and operated in accordance with strict pipeline safety standards established by the U.S. Department of Transportation.
DIG SAFE PROGRAMS
Under federal legislation enacted in 2003 and federal regulations adopted in 2005, persons planning to dig may dial 811 to reach their states' Dig Safe or Underground Alert hotlines. Provides regulatory updates, calling guide, tips and tools, state-specific information.
811
www.call811.com
Louisiana
Louisiana One Call System, Inc.
www.laonecall.com/
(800) 272-3020
|
|
| |